Abstract:- The project is envisaged as a storage scheme. The Hydro Electric Project (1000 MW) consists of 167m High Concrete Face Rock fill Dam. Two head race tunnels to the power house are of horse shoe/circular shape with diameter of 7.2 m and length of about 9.6 km each. The underground power house consists of 4 units of 250 MW each. The turbine is of Vertical Francis type. The 4 numbers of tail race channels are of horse shoe shape of diameter 5.5 m and 125 m in length. When vertical lift gates are used for controlling flow in closed conduits a hydrodynamic force is imposed on it by the flow. When high velocity flow occurs at the bottom of a gate it causes considerable reduction in pressure at the bottom partly due to change of potential energy in to kinetic energy and partly due to change in the direction of the flow. With the pressure acting on the top of the gate remaining near about constant, the gate resulting in resultant force acting in the downward direction, which is termed as “hydrodynamic down pull forceâ€. If the resultant factors influencing the design of the gate and its hoist equipment. Lesser the down pull, smaller, would be the hoist capacity, resulting in reduced cost. In this thesis an attempt is made to calculated hydrodynamic forces analytically further this calculation are checked with the models studies.
These are the objective which is achieved in this thesis:Â
Estimate the hydraulic down pull and uplift forces on gates.
Analytical calculation was calculated for the following gates:
Case.1
- Radial gate assembly=-11098tonnes
- Tunnel spillway bulkhead gate=128tonnes
Case.2
- Power tunnel bulkhead gate=410tonnes
- Power intake service gate = 4464tonnes
These are the result of analytical calculation of high head gate. Model studies of these gates will be done in the hydraulic laboratory.  Â
Keywords:-Â Hydrodynamic forces, down pull forces, uplift forces